Kananaskis Country will be doing avalanche control on the Backside of the third sister and Mt Buller this morning (April 8th). Currently, HWY742 is closed from the bottom of the Canmore hill to 4km South of the Three Sisters Dam. Estimated time of opening is 10:00am with Fair confidence.
HWY742 at Mt Buller will be closed while the control work is taking place for brief periods between 09:30 and 11:00am.
Check the twitter feed for updates on closure times.
Mike Koppang SG
Public Safety Specialist
Kananaskis Country, AB
http://twitter.com/KCPublicSafety